Multipurpose tugs Halli and Spark working at the site of Petäjäs phase 4 at the port of Rauma from kahmari Watch Video
Preview(s):
Gallery
Play Video: (Note: The default playback of the video is HD VERSION. If your browser is buffering the video slowly, please play the REGULAR MP4 VERSION or Open The Video below for better experience. Thank you!)
Description: Boskalis Terramare Oy has signed a contract with the Port of Rauma on 30 September 2019 for the construction of Petäjäs phase 4. The contract includes dredging works of contaminated soil at Petäjäs sea area, soil replacement dredging works, as well as the construction of the upcoming harbour field. The amount of dredged masses is about 300,000 m3. The dredging works are executed by the dredger Kahmari 2 and by the towable barges SCG 3,4,5 ja 6.nnThe port area will be filled and deep compacte